Anaheim, Calif. (Feb. 14) - RMA Land Construction, Inc. (RMA) held a Ribbon Cutting ceremony to commemorate the design-build replacement of the existing laboratory facilities at the Naval Warfare Center - Weapons Division (NAWC-WD) located within Naval Warfare Center, Point Mugu, Ventura, CA. RMA renovated three (3) buildings and provided demolition and disposal of 16 buildings with a total of 101,323 SF of excess building space. This effort consolidated the NAWC-WD from outdated Cold-War era facilities into upgraded code-compliant laboratory complexes.
In attendance at this event were LT CMDR Ward Doss, FEAD Director; RDML Paul Sohl, Commander NAWC-WD; Dr. Ronald Smiley, NAVAIR’s Director of EW/Combat Systems; Bill Crowley, Infrastructure Business Operations Manager; Miguel Hernandez, Construction Manager NAWC; Roy Mohammad, RMA President/CEO; Calvin Hall, Project Manager; Mac Sheikh, QC Manager; Tiger Clifton, Site Safety and Health Officer; and Gina Lopez, Project Coordinator.
RMA Land Construction, Inc. is a design-build general contractor with over 32 years of proven experience on various projects for the Federal government and Department of Defense (DoD) clients. RMA provides design-build management for a multitude of projects in globally diverse locations, including new vertical construction and renovation of administrative buildings, military barracks, hospitals, fitness centers, maintenance facilities and special ops facilities; high and low voltage electrical distribution; heavy and civil/horizontal construction; and maintenance and support services. Visit www.rmaland.com for more information.
###
No comments:
Post a Comment